Why does the suburb come before the site?
Because the suburb decides who will want the finished homes, and the site only decides whether you can build them. A great block in an oversupplied suburb is a project that finishes into a soft market. A middling block in a tight suburb can be a very good project.
So by the time we look at a site, the suburb has already passed the figures (chapter 3), the fundamentals (chapter 4) and the timing (chapter 5). Boomscore’s part ends there. It works at suburb level only and does no street or site research. Everything from here down is our own work.
Development site selection: the three tests every site faces
Most sites fail. That’s normal, and it’s the point of the process. Each one faces three tests, roughly in this order.
Test one: the rules
- Zoning. Does the planning scheme allow the kind and number of homes you need? A site zoned for one house won’t carry four townhouses, however good the suburb.
- Lot size and frontage. Most schemes set minimums for each new lot or each dwelling. A block a few square metres short can lose a whole home.
- Overlays. Flood, bushfire, heritage, character, vegetation and acid sulfate soils can each add cost, shrink the buildable area or rule a site out altogether.
- Easements. A sewer main or drainage easement through the middle of a block can make it unbuildable in practice.
Test two: the block
- Slope. Every metre of fall costs money in retaining walls, piers and stormwater.
- Services. Is there sewer, water and power capacity at the boundary, or will the project pay to bring them in?
- Access. Can the driveways, garbage collection and fire access all work?
- What’s on it. Demolition, asbestos and old fuel tanks are all costs to find before you buy, not after.
Test three: the numbers
This is where most sites that pass the first two still fall over. A feasibility works backwards. Start with what the finished homes will be worth. Take off every cost of creating them: the build, the approvals and council contributions, the consultants, finance and holding costs, and the selling costs. Take off the margin you need for carrying the risk. What’s left is the most you can pay for the land, which is called the residual land value.
If the asking price is above that number, the site doesn’t work, however much you like it. As we say in feasibility 101, if a project isn’t feasible on paper, the market rarely rescues it. Chapter 4 of the property development guide goes through feasibility and residual land value in full.
How we find sites: the tools and the legwork
Finding the block is the hardest part of any development. We lean on Stash Property, which turns 13 million titles into a shortlist of buildable sites, with the zoning, overlays and feasibility checks in one place. It turns the vague question of “where could we build?” into a list of addresses we can test.
Then comes the part software can’t do: walking the street, talking to local agents and property managers about what rents and sells, checking the council’s attitude to similar projects, and knocking on the door of an owner whose block is right but not for sale. A good number of the best sites are bought before they ever reach a listing.
What we build on the site
The site and the suburb decide the product. On a block zoned for higher density, near transport and jobs, that’s UrbanHaus apartments. On a block that suits small lots, it’s TownHaus townhouses. Either way they’re brand new homes, built where the data says demand is outrunning supply. Under the law passed in June 2026, new builds also keep negative gearing from 1 July 2027 when established homes don’t.
A slow market is a developer’s market
A falling market worries most buyers. For a developer it can be the better time to start, for three sourced reasons.
| What a slow market gives a developer | The figure | Source |
|---|---|---|
| Sellers negotiate, on development sites too | Capital-city home sales were an estimated 16.2% lower than a year earlier over the three months to June 2026 | Cotality, 1 Jul 2026 |
| Funding has opened up | More than 37% of construction lenders now require no presales, up from 29% in 2025 and 18% in 2023 (a survey of 110 lenders) | Stamford Capital, debt market survey 2026 |
| Homes started now finish into a shortage | Australia is 124,183 homes behind the Housing Accord’s path after two years | AAP, 7 Oct 2026 |
With fewer buyers around, landowners will talk about price and terms: a longer settlement, settlement subject to approval, or a deferred payment. Presales matter because a lender that wants half the homes sold before it funds the build forces a developer to sell at today’s prices, off the plan. A lender that wants none lets the project wait for the finished value. And the shortfall in new homes means the homes started in a downturn tend to finish into a market that’s short of them.
There are two things a slow market has not given developers in 2026, and we’d rather say so than pretend. Build costs are still rising: 2.8 per cent over the year to June on Cotality’s Cordell construction cost index. And we found no evidence that councils are approving projects any faster. So the edge right now is the site, the terms and the funding, not a cheaper builder.
The site is chosen. Now the price
By this point the growth lens has done its job. The suburb is tight and tightening, the fundamentals hold up, the timing is right and one site has passed all three tests. That is the location question answered.
The other question is the one almost nobody asks: who pays the developer’s margin on the homes built here, and who keeps it? That’s the price lens, and it’s the next chapter.